How a charging point is registered in the Madrid region.
A home charging point of up to 50 kW inside a garage is registered with a design technical report and an installation certificate, signed by an installation company licensed for low voltage, which files them with an inspection body (EICI) of the Madrid region. A full technical project is only needed if the power exceeds 50 kW, if it is outdoors and exceeds 10 kW, or if it is mode 4 charging. We take care of preparing and filing that paperwork.
Information reviewed on 26 October 2026 against the official sources below. If the rules change, we update it. General information, not legal advice; each installation is assessed in the preliminary study.
Frequently asked questions
What documents are filed?
Who files it, and with whom?
When is a full technical project needed?
Is an initial inspection by a control body needed?
How long does it take?
And in a shared garage?